PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Steel angles for the metal deck (3rd Floor) at Elev. 4,5 Facing East (800x600).jpg Backfill and compact inside Stair -2 Facing West(800x600).jpg Bolted column Facing North-West(800x600).jpg Installing steel deck angles at Elev. 1,2,3 (2nd Floor) Facing East (800x600).jpg Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Welding the connection beam angles at Derrick -1 Facing South (800x600).jpg
Previous pageNext page Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600)
Shear wall panels at Elev. 7-Stair -4,5 Facing South-East (800x600)